
Multi-use stadiums are all the rage now, but 40 years ago QPR chairman Jim Gregory has a vision way ahead of its time, writes Alan Sendorek.
According to its 250-page feasibility study, Milan’s new €1.2bn Generali stadium, due to open for the 2031-32 season, is designed to operate 365 days a year.
This is not a new idea. It will follow in the footsteps of the new Bernabeu in Madrid, SoFi in Los Angeles, and London’s own Tottenham Hotspur Stadium in hosting concerts and other sports to generate revenue all year round.
The concept has been familiar in the US for decades. And it almost arrived in Europe much earlier than the 2000s – in Shepherds Bush in the 1980s.
In 1981, QPR‘s enterprising chairman Jim Gregory set out an ambition for a 365-day stadium at Loftus Road. As he told the Acton Gazette in January of that year: “I want to build an all-purpose stadium. That is the direction that football clubs must go in the future. When the stand is finished, Loftus Road will be able to hold boxing matches, concerts, and other activities.”
Stay in the know
Three daily briefings with the key market moves and top business and political stories.
SUBSCRIBE HEREQPR had already hosted a concert by the band Yes at the end of the season in May 1975. But it was obvious to Gregory that the grass pitch was a barrier to more intensive non-matchday use.
Multi-purpose stadium inspired by USA
In 1979 he travelled to the US and saw the 82,000-seater Pontiac Silverdome in Michigan, which remained the largest capacity NFL stadium until 2000. With its synthetic pitch and air-inflated roof, it was as comfortable hosting 1994 World Cup matches and the Super Bowl as it was WrestleMania and an NBA All-Star Game.
At the start of the 1981-82 season, QPR became the first club in English league football to install a plastic pitch. The Omniturf surface would help to overcome a significant drainage problem at Loftus Road, but it also enabled its multifunctional use.
The move was controversial and significant regulatory obstacles had to be overcome, particularly getting permission from the relevant footballing authorities. By October 1981, QPR had played five league games and one League Cup game on the synthetic surface, but the FA was still yet to grant permission for FA Cup Games.
Uefa took a firm line, saying QPR would never be able to play European football on it. In 1985, when QPR qualified, Uefa was as good as its word and home games were staged at Arsenal’s Highbury instead.
Even after the 1981-82 season, the Football League made another attempt to prevent synthetic surfaces. In the end, they allowed QPR’s to continue but demanded that others seek specific permission.
How plastic pitch made money for QPR
The innovation paid some dividends. QPR’s 1984 accounts refer to the artificial surface enabling non-matchday income of £107,100. Out of a total annual revenue of £1,569,000, the sum was relatively small but worth having.
Perhaps the most famous non-matchday event at Loftus Road in this period was Barry McGuigan’s WBA world featherweight title fight against Eusebio Pedroza in June 1985.
Without doubt, the most controversial was a six-week residency for Argentinian evangelist Luis Palau in 1984 (footage of his Mission to London is available on YouTube). His midweek evening services led to the formation of a Residents’ Amenities Protection Association (RAPA), who protested to the council about excessive noise and light.
In 1982, Gregory attempted to go one better, submitting a planning application for a £2.5m air-inflated roof to enclose the pitch, which was granted. As he explained to the Marylebone Mercury: “Once we have a roof there will be no limitations on the use of the stadium. With a synthetic pitch too, the world will be our oyster in terms of staging as many events as we want.”
Ultimately, the roof was never installed, due to a mixture of FA regulations and excessive capital outlay. And the multifunctional use of Loftus Road Stadium was held back by its location in a dense residential area, with the local council keeping a lid on non-matchday use through its planning and licensing powers.
How modern stadium projects differ
How do modern mega projects differ from this 1981 prototype? Rather than ad hoc attempts to increase revenue, modern 365-day stadium developments are usually part of a wider comprehensive regeneration, kickstarting housing and other commercial uses that might otherwise not take place. At their best, they are aligned to public sector objectives to ensure support and sometimes even a contribution to funding or financing.
Similar thinking is now spreading beyond the Premier League’s traditional powerhouses: even smaller clubs are chasing the same multifunctional model, building theme-park style attractions into new grounds to drive income outside the 90 minutes.
As for QPR, Jim Gregory’s vision of a multifunctional stadium at Loftus Road remains unfulfilled, with a roofless grass pitch that is still used approximately 25 days a year. For how much longer this is viable at the top end of the football pyramid is yet to be seen.
Alan Sendorek is a London-based communications, strategy and advisory professional who serves as a director at Flint Global. He was head of strategy at QPR Property from 2015-20.